LiON Switch in Practical Use
Self-Sufficient E-Bike Charging Infrastructure for Michelin
ONgineer
, in collaboration with AlKuTec Bovend and Elektro Huber, installed a PV-powered e-bike charging station for the Michelin tire plant
in Bad Fallingbostel.
LiON Switch units handle the central storage,
control, and power supply for the connected charging stations.
This made it possible to implement multiple charging points independently of the public
power grid.
✓
PV-Powered Energy Supply
Solar energy is stored centrally and made available to the
charging points.
✓
Off-Grid Operation
The charging infrastructure was implemented without a connection to the public
power grid.
✓
Remote Monitoring of the System
Selected operating parameters can be monitored
and analyzed remotely.
Joint project with:
AlKuTec Bovend GmbH
Elektro Huber GmbH
ONgineer GmbH
The reference project was implemented using an earlier generation of the LiON Box.
Current projects are planned using the LiON Box X or LiON Box S.