E-bike charging infrastructure by sector

Finding the right solution for different locations, users and requirements.



E-bike charging infrastructure by sector

Solutions for a range of requirements

The right e-bike charging infrastructure for your location

Businesses, local authorities, the property sector, retail and tourism place different demands on charging infrastructure. Key factors include the user group, available space, the electricity supply and the level of service required at the location.

ONgineer’s direct charging technology forms the common basis – from compact charging points to self-contained complete systems. Select the sector that best suits your location.

Personal planning Not sure which solution is right for you? We can help you with charging points, locations and the appropriate infrastructure.
ONE TECHNOLOGY, VARIOUS APPLICATIONS

What all sectors have in common

Different locations require different solutions. The basic requirements for a professional e-bike charging infrastructure remain the same.

Download directly

With ONgineer’s direct-charging technology, the e-bike battery is connected directly to the charging station – without the need for a separate charger.

From the charging point to the complete system

The portfolio ranges from compact, grid-connected charging points to self-sufficient systems with solar power and battery storage.

For existing and new sites

Existing cycle parking facilities can be taken into account , as can newly planned charging, parking or rest areas.

Customised design

Depending on the product, the charging infrastructure can be adapted to the corporate design, architecture or the desired messaging at the site.

Orientation by location

Which solution is right for your location?

It is not the sector alone that determines the most suitable charging infrastructure. The power supply, available space and required functions determine which system is best suited to your location.

01
Is there a power socket?

Turning existing spaces into charging points

If a suitable mounting surface or cycle parking facility is already in place, the charging infrastructure can be integrated in a compact manner. The LiON Box X offers two direct charging points and can also be integrated into existing parking facilities.

The right solution LiON Box X View product →
02
Would you like to load and unload?

Combining a charging point with cycle parking spaces

Where there is currently no suitable parking facility, the LiON Stand combines the LiON Box X with two bicycle parking spaces to form a compact solution. The cabling is routed safely through the stand system.

The right solution LiON Box X + LiON Stand View system →
03
Is the surface long or narrow?

Loading and parallel parking

The LiON Rack makes efficient use of linear space and combines six parking bays with four direct charging points. Solar power with battery storage means the system does not rely on a mains connection at the installation site.

The right solution LiON Rack View the LiON Rack →
04
Self-sufficient and visible?

Setting up your own charging hotspot

The LiON Tree combines six direct charging points with solar power and battery storage. It is particularly suitable for locations without a suitable mains connection or where the charging infrastructure is intended to be deliberately visible.

The right solution LiON Tree View LiON Tree →
PRACTICAL EXAMPLES

Charging infrastructure across various sectors

Businesses, local authorities, the property sector, retail and tourism: selected projects demonstrate the wide range of ways in which e-bike charging infrastructure can be used.

Company

Boston Consulting Group

E-bike charging points at the company’s premises provide a direct charging facility for staff and other users.

About the industry solution →
Property

Victoria4You · Sylt

At the holiday apartment complex in Westerland, e-bike charging points are available right next to the bicycle parking spaces.

About the industry solution →
Trade

EDEKA Sinzheim

The e-bike charging infrastructure adds an additional charging facility to the site for customers travelling by bike.

About the industry solution →
Tourism

BEDAIUM Roman Museum

Right next to the Chiemsee Cycle Route, visitors can charge their e-bikes whilst they are visiting the museum.

About the industry solution →
FREQUENTLY ASKED QUESTIONS

Questions about the right e-bike charging infrastructure

The location, intended use and existing infrastructure determine which solution is best suited to your project.

Which e-bike charging solution is best suited to our location?

Key factors include, amongst others, the desired number of charging points, existing cycle parking facilities, the available space and the power supply at the site. ONgineer offers solutions for this, ranging from compact charging points to self-sufficient solar systems.

Can existing cycle parking facilities be retrofitted?

Yes, provided the structural requirements are met. A LiON Box X, for example, can be integrated into suitable existing spaces or into existing parking areas. Even if new parking spaces are required, combined charging and parking solutions are available.

Do users need their own e-bike charger?

With ONgineer’s direct-charge technology, the e-bike battery is connected directly to the appropriate port on the charging station. This means there is no need to bring a separate charger with you.

Are there any solutions for sites without a mains connection?

Yes. With LiON Rack and LiON Tree, solar-powered systems with battery storage are available that can be operated without a grid connection at the installation site.

Can shopping and cycle parking be combined?

Yes. The LiON Stand combines the LiON Box X with two cycle parking spaces. The LiON Rack and LiON Tree also combine charging infrastructure with designated parking or recreational areas.

Can the charging infrastructure be adapted to our corporate design?

Depending on the product, customised designs are possible. This means the charging infrastructure can be adapted to suit the colours, corporate identity or architecture of the site. LiON Rack and LiON Tree also offer larger areas for branding and site-specific information.

Does ONgineer provide support with selection and planning?

Yes. We will work with you to assess the location, intended use, existing infrastructure and required functions, in order to put together a suitable solution for your project.

Which charging solution is right for your project?

We’d be happy to help you plan and choose the right charging point.

 

We’d be happy to call you back!

Do you have a question about our products or would you like a quote? We’d be happy to give you a call!
Simply send us your telephone number and your preferred time for us to call you. Please note our opening hours: 
Monday to Thursday 9 am – 4 pm, Friday 9 am – 12 noon. 

Telephone number including area code (e.g. 0123 456789)